Overview

Dashboard Utama

Vendor Terbaik

Vendor B

Sisa Stok Gudang

K-1-PUTIH K-1-HITAM K-1-ABU-ABU
57 90 98

Sisa Stok di Gudang

Skor VPI per Vendor

Performa Pengiriman per Vendor

Jumlah Pesanan/return per Vendor

Data Setiap Vendor

Vendor Qty Diterima (kg) Qty Defect (kg) Total Pengiriman Tepat Waktu Harga (Rp/kg)
Vendor A 2 1 2 2 75
Vendor B 2 0 1 1 73
Vendor C 2 2 2 0 72

Skoring VPI per Vendor

Vendor Quality Delivery Price VPI Ranking
Vendor A 50 100 96 74,2 2
Vendor B 100 100 98,6 99,7 1
Vendor C 0 0 100 20,0 3

Material Requirements Planning

Implementasi MRP (Metode LFL, Lead Time 1 Minggu)

Tabel MRP — Defect Rate 2,5%

Komponen PD M1 M2 M3 M4 M5 M6 M7 Satuan
GR — Kebutuhan Kotor - 50 50 50 50 50 50 50 kg
SR — Penerimaan Terjadwal - 10 0 0 0 0 0 0 kg
PoH — Persediaan Awal 20 0 0 0 0 0 0 0 kg
NR — Kebutuhan Bersih - 20 50 50 50 50 50 50 kg
PORt — Penerimaan Terencana - 20 50 50 50 50 50 50 kg
PORel — Pelepasan Pesanan 20 50 50 50 50 50 50 0 kg

Grafik MRP — Kebutuhan vs Pelepasan Pesanan

Quality Control

Implementasi QC — SNI AQL 2,5%

Log Inspeksi Quality Control

No Tanggal Material Vendor Sampel Cacat Hasil AQL Hasil Akhir Status Kirim
1 1 Jun 2026 K-1-PUTIH Vendor A 8 1 LOLOS RETURN TEPAT WAKTU
2 10 Jun 2026 K-1-HITAM Vendor B 13 0 LOLOS LOLOS TEPAT WAKTU
3 15 Jun 2026 K-1-ABU-ABU Vendor C 20 2 RETUR RETURN DELAY
4 16 Jun 2026 K-1-PUTIH Vendor A 2 2 RETUR LOLOS TEPAT WAKTU
5 17 Jun 2026 K-1-HITAM Vendor B 50 2 LOLOS LOLOS DELAY
6 18 Jun 2026 K-1-ABU-ABU Vendor C 3 20 RETUR RETURN DELAY

Administrasi Defect — Pemesanan & Cacat

Vendor Material Total Pesanan Sampel (n) Cacat Lolos Return
Vendor A K-1-PUTIH 2 10 3 1 1
Vendor B K-1-HITAM 2 63 2 2 0

Administrasi Defect — Pengiriman

Vendor Total Pengiriman Total Delay
Vendor A 2 0
Vendor B 2 1

First In First Out

Penyimpanan FIFO — Kapasitas 500 kg

Log Pergerakan Stok Gudang

Tanggal Jenis Material Vendor Masuk (kg) Keluar (kg) Total Gudang (kg) Margin (kg)
1 Jun 2026 IN K-1-PUTIH Vendor A 100 - 100 400
2 Jun 2026 IN K-1-HITAM Vendor B 90 - 190 310
3 Jun 2026 IN K-1-ABU-ABU Vendor C 98 - 288 212
4 Jun 2026 IN K-1-PUTIH Vendor A 100 - 388 112
5 Jun 2026 OUT K-1-PUTIH Vendor B - 98 290 210
10 Jun 2026 OUT K-1-PUTIH Vendor B - 45 245 255

Grafik Kapasitas Gudang